ID 60175

Slave Phasing not possible, because synchronization is not reached.

Description

Phasing (PLC module MC_Phasing) was ordered for the slave axis of a synchronous group, although the axis was still in the process of synchronizing to its master axis.

Response

Class

6

Abort NC-Program / PLC-block reports an error.

Solution

Class

6

Only order phasing after the slave axis has synchronized to the master axis (output InGear or InSync of the slave axis is TRUE).

Parameter

%1:

 

Logical axis number (P-AXIS-00016) of the spindle.

Error type

1, Error message from NC program.