ID 140048
At the moment, it is only possible to switch to phase 2. Instruction was corrected. | ||||
Description | Since the service channel is still blocked by an action that was commanded before, a communication phase switch can only be done to communication phase 2. Therefore the phase switch is stopped in communication phase 2. | |||
Response | Class | 1 | Warning output. | |
Solution | Class | 1 | Abort the previous service channel command in communication phase 2 and then start phase switch again. | |
Parameter | %1: | Current value [-] | ||
Internal code for the commanded communication phase. | ||||
%2: | Corrected value [-] | |||
Internal code for communication phase 2. | ||||
Error type | 3, Error message from communication. | |||